Our customer support team is available to help you

Address

53 Old Theatre Street, Valletta VLT 1427, Malta.

Phone

+356 9926 3572
+44 7950 431076

FAQ

What is Dynamic Positioning, and how does it work?

Dynamic Positioning (DP) is an automated system that enables a vessel to maintain its position and heading without using anchors or mooring lines. It uses a combination of sensors, thrusters, and a computerised control system that continuously adjusts thruster forces to maintain position. The DP system receives input from GPS, gyrocompasses, motion sensors, and wind sensors to make real-time corrections, ensuring precise station-keeping.

What is the difference between DP1, DP2, and DP3?

The main differences between DP1, DP2, and DP3 vessels relate to their levels of redundancy and reliability:

  • DP1: Has a single DP control system with no redundancy. A single failure can result in a loss of position.
  • DP2: Also redundant propulsion.
  • DP3: Offers the highest level of redundancy, DP control can be maintained after the loss of all the equipment in a single compartment due to fire or flood.

What is a DP Annual Trial, and why is it required?

A DP Annual Trial is a yearly assessment of a vessel’s DP system to verify its performance, redundancy, and compliance with industry standards (such as IMCA, DNV, or ABS guidelines). The trial includes tests on position-keeping capabilities, redundancy management, failure response, and emergency procedures.

Why is it required?

  • Ensures the DP system remains in optimal working condition.
  • Verifies that previous issues have been addressed and that new modifications function correctly.
  • Meets regulatory and class certification requirements.
  • Enhances operational safety and minimises the risk of DP-related incidents.

What is a DP FMEA Proving Trial, and when is it required?

A DP FMEA Proving Trial is a specialised test conducted to validate the findings of a vessel’s Failure Modes and Effects Analysis (FMEA). It involves live testing of worst-case failure scenarios to ensure the vessel’s DP system can maintain position under fault conditions.

When is it required?

  • When a new DP vessel is commissioned.
  • After major modifications to the DP system, power management, or propulsion system.
  • When a vessel changes DP class notation (e.g., upgrading from DP1 to DP2).
  • To comply with industry standards and class society requirements.